The Client
The Brief
The Response
From the dusty grounds of the construction plant, Eventeam built a high-quality marquee of 400 sqm with transparent walls and white ceiling, all-metal elements covered with canvas.The furniture was of high quality, the excellent audiovisual system covered the audio and video needs, and the ambience was extremely pleasant with a 6 powerful air conditioning machines assuring the ideal temperature and the needed hygienic standards with germicidal lamps in the filters.
A detailed contingency plan was elaborated and submitted by Eventeam to the Health Authorities, and an ambulance and isolation room were available at all times. The Covid-19 prevention was completed with many gel distributers, mask disposal and specific signage vertical and horizontal all around the area.
The ceremony was completed burying a time capsule with iconic elements inside for the coming generations, followed by a networking cocktail with a premium catering service.